Deftara Quoting estimates from your costs, not market rates. Your materials and labour sit in a price book at what you pay. Kits turn “20 m² of deck” into every line it takes, your markup goes on top, and you see when a quote drops below the floor you set.
It doesn’t measure from plans. You take the quantities on site or from a calculator and enter them. If you estimate new builds from PDF plans every day, a take-off tool like Buildxact or Buildsoft is the better fit.
An example estimate
A 4.8 m by 3.6 m timber pergola with a Colorbond roof. The figures are made up; yours come from your own price book.
| Line | Qty | Unit | Your cost, ex GST |
|---|---|---|---|
| H4 treated pine posts 90 × 90 | 12 | m | $336.00 |
| H3 treated pine beams 240 × 45 | 9.6 | m | $307.20 |
| H3 treated pine rafters 140 × 45 | 25.2 | m | $352.80 |
| Colorbond Trimdek (17.28 m² plus 5%) | 18.1 | m² | $687.80 |
| Concrete footings | 4 | each | $260.00 |
| Flashings, post stirrups and fixings | 1 | lot | $310.00 |
| Carpenter | 40 | hr | $2,720.00 |
| Your cost | $4,973.80 | ||
| Price at a 30% markup, ex GST | $6,465.94 | ||
| GST | $646.59 | ||
| Customer pays | $7,112.53 | ||
The profit is $1,492.14. That’s a 30% markup on cost, and a 23.1% margin on the price.
Your price book
Every material and labour item has its unit, your cost, the supplier, the SKU and a category. Search finds an item by its description, supplier or SKU.
- Old costs are flagged. A cost you haven’t confirmed for 90 days shows its age when you pick it, for example “94d old”. Only changing the cost resets the clock; editing the description doesn’t.
- Raise a category by a percentage. When your timber supplier puts prices up 6%, raise the whole timber category by 6%. It shows how many items will change and a worked example, and asks before it applies.
- We load it for you. Send us your supplier lists or a spreadsheet and we set the price book up as part of the free setup.
Kits for the jobs you repeat
A kit is a recipe for one unit of a job. “Pergola roof, per m²” might be a square metre of sheet, 1.4 metres of rafter and a share of the flashings, each with its own waste percentage. Insert it for 17.28 m² and it becomes ordinary lines on the quote, priced from your price book as it stands today, under a heading with the kit’s name.
Measuring on site? Enter a length and width, or a list of runs, plus a waste percentage, and the quantity fills in.
Markup, margin and your floor
Each quote has one markup percentage: your cost plus that much on top. A new quote starts at 20% and the floor is 15% until you change them. When a quote’s markup is under the floor, the builder says “Markup is below your 15% floor” before you send it. If you’d rather it couldn’t go out at all, switch on “Stop quotes going out under the floor”.
Markup and margin are easy to mix up. Markup is the profit as a share of your cost; margin is the profit as a share of the price.
| Markup on cost | Margin on price |
|---|---|
| 15% | 13.0% |
| 20% | 16.7% |
| 25% | 20.0% |
| 30% | 23.1% |
| 33.3% | 25.0% |
| 50% | 33.3% |
To work out a price from a target margin, use our markup vs margin calculator.
Options, extras and ballpark estimates
Give the customer up to three options, named Good, Better and Best, with optional extras that apply to every option or to one. Their quote page opens on the cheapest and updates the total as they choose.
Not ready to quote? Send an estimate: a price range marked as not a quote, with a button to book the site visit. You can charge for the visit and take the fee off the price if they go ahead.
Save a quote you send often as a template. Inclusions, exclusions and payment terms come from a clause library, so they’re worded the same on every quote.
Measuring first?
Our free calculators give you the quantities: roof pitch, roof sheets and decking. See an estimate built for a re-roof or a deck.