Concrete slab calculator: how much to order.

Cubic metres with edge beams, mesh sheets, bar chairs and premix bags, with the NCC’s slab rules. It works in your browser; nothing you enter is sent anywhere.

Concrete to order

Slab area
Slab
Beams below the slab
Mesh sheets
In full rows
Bar chairs
Film rolls
Or premix bags
Concrete and mesh

Beam depth is from the top of the slab. The order is rounded up to 0.1 m³. The lower mesh count reuses offcuts; the higher one lays whole sheets in rows, and the price uses it.

How much concrete for a slab

Length × width × thickness, all in metres, gives the cubic metres. A slab 6 m by 4 m and 100 mm thick is 6 × 4 × 0.1 = 2.4 m³. Edge beams add their width × their depth below the slab, all the way round. Then add a little for an uneven base and spillage, and round up to what your supplier will sell you.

For a house slab the NCC’s Housing Provisions draw the slab at 100 mm thick, with edge and internal beams 300 mm wide at the bottom and 300 to 850 mm deep, depending on the site class and the walls (Tables 4.2.14a to c, Figures 4.2.14a and 4.2.16).

A worked example

A garage slab 12 m by 9 m, 100 mm thick, with a 300 mm wide edge beam 300 mm deep and 5% extra:

  • The slab is 12 × 9 × 0.1 = 10.8 m³.
  • The edge beam runs 0.3 m wide round the edge, 12.24 m² on plan once the corners are counted once, and reaches 0.2 m below the slab: 2.45 m³.
  • 13.25 m³ plus 5% is 13.91 m³, so order 14 m³.
  • Mesh: ARC’s rule of thumb, 108 m² ÷ 12.4, says 9 sheets of 6.0 × 2.4 m. Laid in full rows without reusing offcuts it’s 12, because 11.92 m (the slab less 40 mm cover each end) is just over two lapped sheets.
  • Bar chairs: 108 ÷ 0.56 is 193.

Which mesh

For a stiffened raft slab, the NCC sets the slab mesh by site class and wall type (Tables 4.2.14a, b and c). The site class comes from a soil test to AS 2870.

External wallsClass AClass SClass M
Clad frameSL72; beams 300, 3-L8TMSL72; beams 300, 3-L8TMSL72; beams 300, 3-L11TM
Articulated masonry veneerSL72; beams 300, 3-L8TMSL72; beams 300, 3-L8TMSL72; beams 400, 3-L11TM
Masonry veneerSL72; beams 300, 3-L8TMSL72; beams 300, 3-L11TMSL72; beams 400, 3-L11TM
Articulated full masonrySL72; beams 400, 3-L8TMSL72; beams 450, 3-L11TMSL82; beams 500, 3-L12TM
Full masonrySL72; beams 400, 3-L8TMSL82; beams 450, 3-N16SL92; beams 850, 3-N16
Slab mesh, then the beam depth in mm from the top of the slab and the bottom reinforcement in the beams. NCC 2025 Housing Provisions Tables 4.2.14a to c, the same in NCC 2022. Class S full masonry and the Class M rows also set a maximum beam spacing; see the tables.

Tiles over 16 m²: where ceramic tiles or another brittle floor will cover more than 16 m², NCC 4.2.19 asks for one of these: SL92 throughout that area, mesh top and bottom, a bedding system chosen for the slab’s movement, or waiting at least 3 months after the pour before laying the floor.

On H, E and P sites, Part 4.2 doesn’t apply: the slab is designed to AS 2870. Part 4.2 also only covers houses within the limits in H1D4(2).

Mesh sheet sizes

SheetSizeSL82 massMaker’s count
ARC full sheet6.0 × 2.4 m52 kgArea ÷ 12.4, rounded up
InfraBuild full sheet5.8 × 2.4 m between the outer wires, up to 6 m with the fly ends52 kgArea ÷ 12.5, rounded up
ARC 4B2 (ute sheet)4.0 × 2.0 m30 kgNot given; the calculator uses ARC’s full-sheet allowance
SL mesh has wires at 200 mm both ways: SL72 is 6.75 mm wire, SL82 7.6 mm, SL92 8.55 to 8.6 mm. ARC’s rule assumes the standard lap of the two outermost wires.

Every size, with rectangular and trench mesh, is on the reo mesh sizes page.

Laps (NCC 4.2.11): square and rectangular mesh is lapped so the two outermost cross wires of one sheet overlap the two outermost wires of the next. Trench mesh and bars up to 12 mm need a 500 mm splice, and bars over 12 mm up to 16 mm need 700 mm.

Cover and bar chairs

NCC 4.2.11 sets the minimum concrete between the outside of the steel (including tie wire) and the concrete’s surface:

  • 40 mm to unprotected ground, and 40 mm to external exposure.
  • 30 mm to a membrane in contact with the ground.
  • 20 mm to an internal surface.

Mesh sits on bar chairs of wire, concrete or plastic, no more than 800 mm apart. Wire chairs on soft ground or on the plastic membrane need flat bases. InfraBuild’s rule of thumb, slab area ÷ 0.56, puts chairs about 750 mm apart, inside that limit.

The concrete

NCC 4.2.10 asks for concrete to AS 3600 with a 28-day strength of at least 20 MPa (N20), 20 mm maximum aggregate and a nominal 100 mm slump. Don’t add water on site to loosen it beyond the slump you ordered. The NCC’s explanatory note says the truck should be emptied within an hour and a half of the water going in, unless the mix has a retarder. South Australia has its own version of this clause.

Vapour barrier

A house slab on the ground (and a Class 10 slab joined to it) goes on a vapour barrier: 0.2 mm polyethylene film, medium impact resistance, branded “AS 2870 Concrete underlay, 0.2 mm Medium impact resistance”. Lap it at least 200 mm at every joint, tape round pipes, and run it under the beams to finish at ground level (NCC 4.2.8). InfraBuild counts one 200 m² roll for every 180 m² of slab; beams take more. NSW and South Australia have their own variations to 4.2.8.

Bags or a truck

Premixed bags make sense for a small pad or a few post holes. Past that, the numbers climb fast: a cubic metre is about 100 to 110 bags of 20 kg.

Bagged concreteBags a m³Data sheet
Boral Concrete Mix, 20 kg108February 2022
Cement Australia Concrete Mix, 20 kg110Revision 3.0, February 2012
Easy Mix Concrete, 20 kg100March 2020
Easy Mix Concrete, 30 kg67March 2020

What it doesn’t cover

It works out one rectangle. For an L-shaped slab, split it into rectangles and add them up. It counts beams as square-sided, so for beams with sloped sides use their average width. It doesn’t design anything: it doesn’t pick the mesh, the beams or the site class for you, and it doesn’t cover suspended slabs, piers or pad footings. Driveways, paths and council crossings aren’t in Part 4.2; councils set their own crossing specifications.

From materials to a price

Deftara Quoting prices a square metre of slab once, as a kit of concrete, mesh, chairs, film and labour, so every quote prices itself from the area and your own costs. Then check your markup and margin, and what an hour of your time costs with the charge-out rate calculator.

More for trades

The brick calculator counts bricks and mortar for the walls, the fence calculator counts posts and post-hole concrete, and the trade tools page has the rest.

Sources

Talk to us

Pricing slabs by the square metre?

Deftara Quoting prices it from your own costs. Tell us how you quote now.

We need your name and an email or a phone number. The rest helps us prepare.

We only use these details to reply to you. Privacy

What happens next

  1. Talk

    Tell us how the business runs and what you use now.

  2. Match

    We pick the closest app and tell you what would change.

  3. Set up

    Your branding, your data and your team’s logins, at no cost.

  4. Go live

    Your team starts using it on its own copy.

Prefer email? Send a recent quote to hello@deftara.com.au, with the prices blanked out if you like.