What sarking does
Sarking is a flexible membrane laid over the rafters or trusses, under the battens. Under tiles it catches the rain and dust that wind drives between them and runs it down to the gutter. Foil-faced sarking also counts as reflective insulation when it faces an air gap of at least 20 mm. In the NCC and the makers’ data sheets it’s a “pliable building membrane” or “sarking-type material”, made to AS/NZS 4200.1.
When a tiled roof needs sarking
NCC Housing Provisions 7.3.4 sets it by pitch and by rafter length, measured down the rafter or truss top chord from the apex; use the longest one. Past the length in the table, the rest of the rafter down to the eaves has to be sarked. The table is the same in NCC 2022 and NCC 2025.
| Roof pitch | Longest rafter without sarking |
|---|---|
| Under 18° | None: sark the whole roof |
| 18° to under 20° | 4,500 mm |
| 20° to under 22° | 5,500 mm |
| 22° and steeper | 6,000 mm |
Where sarking goes in, 7.3.4 also says how:
- Made to AS 4200.1.
- Each sheet or roll lapped at least 150 mm over the next, or taped together.
- Fixed at no more than 300 mm centres to the rafters or trusses.
- No sag deeper than 40 mm.
Then 7.3.5: wherever sarking goes on a tiled roof under 20°, or on a roof with no eaves overhang at any pitch, it needs an anti-ponding board. It’s water resistant, fixed along the eaves from the top of the fascia back up the rafter, about 50 mm below the first batten, so water on the sarking can’t pool behind the fascia.
Part 7.3 only covers tiled roofs from 15° to 35°, in wind class N3 or lower, with tiles to AS 2049. Anything else is built to AS 2050 (NCC Volume Two, H1D7).
Under a metal roof
NCC Part 7.2, for metal sheet roofs, has no sarking rule. It’s still common under metal: Fletcher’s data sheet for its metal-roof sarking sells it on cutting rain noise and draughts. The rule that does reach metal roofs is condensation, in Part 10.8.
Condensation: climate zones 6, 7 and 8
Part 10.8 only applies in NCC climate zones 6, 7 and 8, the cooler parts of Australia. Look up an address on the ABCB climate map; the ABCB says not to go by postcode or council area, because zone lines cross them. Which version applies depends on the state:
- NSW and Tasmania keep NCC 2022’s Part 10.8, even under NCC 2025. The roof needs a space at least 20 mm high above the insulation, ventilated to outside air through openings spread evenly (Table 10.8.3), unless it sits right under the tiles of an unsarked tiled roof. If sarking is laid straight onto the insulation, the space can go above the sarking instead, but only if the sarking has a vapour permeance of at least 1.14 μg/N.s.
- Other states, once they adopt NCC 2025 (from 1 May 2026, each on its own date): the roof space above the insulation is at least 18 mm high and ventilated, with the openings in Table 10.8.3 (for pitches from 10° to under 75°, 7,000 mm² a metre at the eaves and 5,000 mm² a metre up high). Where the insulation runs parallel to the roof, a sarking or other control layer laid straight on it needs a vapour permeance of at least 1.14 μg/N.s. A tiled roof with no control layer above the insulation is exempt.
In both versions, concrete roofs, insulated panel roofs and roofs built to BAL-FZ are exempt.
Why it matters for the sarking you buy: ordinary foil sarking stops vapour. Fletcher’s data sheet for its foil tile-roof sarking lists it as a Class 1 vapour barrier. Laid straight onto a blanket under a metal roof in these zones, you want a vapour-permeable sarking instead. Fletcher’s Vapawrap metal-roof membrane lists a permeance above 1.1403 μg/N.s (Class 4), and Bradford sells Enviroseal Tuff as a vapour-permeable roof underlay. Check the figure on the data sheet of whatever you use.
Bushfire-prone areas
On a bushfire-prone block, the roof is built to AS 3959 for its Bushfire Attack Level (BAL). The standard is paywalled, so read your BAL report and the roofing and sarking makers’ guides. CSR Bradford’s summary: from BAL-12.5 to BAL-40, low-flammability sarking is mandatory, and BAL-FZ needs more on top. Makers test the flammability index to AS 1530.2 and print it on the data sheet; Fletcher’s tile and metal roof sarking both list 5 or less.
How the calculator counts rolls
- A plan area (eaves included) becomes the area along the slope: plan area ÷ cos(pitch). The roof pitch calculator gives the same factor.
- Each roll covers its width less the lap, times its length, because the next run up overlaps it.
- It adds your waste for hips, valleys, end laps and offcuts, and rounds up to whole rolls.
The 5% waste is a starting figure, not a rule: a plain gable wastes less, a roof full of hips and valleys more. The NCC’s 150 mm lap is for tiled roofs; use the maker’s lap under metal sheets.
A worked example
A tiled roof at 20°, 150 m² on plan, with a 6.2 m rafter from apex to eaves:
- At 20° the rafter can run 5,500 mm without sarking, so the NCC needs the lowest 700 mm of each rafter sarked. At 20° with eaves, no anti-ponding board.
- Sarking the whole roof is simpler, and the calculator counts it that way. Along the slope that’s 150 ÷ cos 20° = 159.6 m², or 167.6 m² with 5% waste.
- A 1500 mm × 30 m roll lapped 150 mm covers 1.35 × 30 = 40.5 m², so that’s 5 rolls.
Roll sizes
| Roll | Area | Lapped 150 mm | For example |
|---|---|---|---|
| 1350 mm × 30 m | 40.5 m² | 36 m² | Fletcher Sisalation Metal Roof MD, Sisalation Vapawrap metal roof |
| 1350 mm × 60 m | 81 m² | 72 m² | Fletcher Sisalation Metal Roof MD and HD |
| 1500 mm × 30 m | 45 m² | 40.5 m² | Fletcher Sisalation Tile Roof, Bradford Enviroseal Tuff |
From roof to price
We don’t publish sarking prices: they change by supplier and by brand. Put your own price a roll into the calculator. On a full quote, that’s the job Deftara Quoting does for roofers: sarking, sheets and flashings from your own price list, each priced as your cost plus your markup.
More for trades
- Roof sheet calculatorSheet length, sheet count, ridge, barge and gutter for a gable or skillion roof.
- Roof pitch calculatorRise and run in millimetres to degrees and rafter length, plus minimum pitch by profile.
- Downpipe calculatorHow many downpipes and which gutter size, from the NCC rainfall table.
Sources
- NCC 2025, ABCB Housing Provisions Part 7.3: 7.3.4 and Table 7.3.4 with its notes, 7.3.5. The same in NCC 2022. Checked 2 November 2026.
- NCC 2025 Volume Two, Part H1: H1D7(3), when Part 7.3 applies. Checked 2 November 2026.
- NCC 2025, ABCB Housing Provisions Part 7.2: sheet roofing, no sarking clause. Checked 2 November 2026.
- NCC 2025 Part 10.8 (10.8.3, 10.8.4, Table 10.8.3), NCC 2022 Part 10.8 (10.8.3), and the NSW and Tasmanian variations that keep the 2022 version. Checked 2 November 2026.
- ABCB, NCC 2025 released: states can adopt it from 1 May 2026. ABCB climate map.
- Fletcher Insulation data sheets: Sisalation Tile Roof (465), Sisalation Metal Roof and Sisalation Vapawrap Vapour Permeable Metal Roof. Checked 2 November 2026.
- CSR Bradford: Enviroseal Tuff and Sarking and the Building Code of Australia (bushfire summary). Checked 2 November 2026.